Completed Projects

what makes us different, and why're the right company for the job.

Why Choose Nielsen Environmental

Demolition

Client: Gini Properties IX, LLC

Address: 1414 Donhill Drive Beverly Hills CA. 90210

General Contractor: Flowers Construction

Attributes: This house is 3,508 Sf that sits on 1.2 acre lot and was built in 1961. The property owner is currently making way for a new design build. The lot has views of Century City, Downtown and South Bay.

Scope of Work: Remove asbestos and tear down existing building.

Date of Completion: 12/16/2015

Asbestos Removal

Client: 1155 Angelo Dr, LLC

General Contractor: Not Awarded

Asbestos Consultant: Patriot Environmental Daniel Romero CSST 14-5241

Attributes: Gated 1928 Mediterranean Mansion. 45 year residence of the late great poet, singer, song writer Rod McKuen. Mostly level lot just under an acre. Huge rooms; high ceilings; spectacular hallways leading to seven bedrooms and more than seven baths, library, den living room with Bacharach crystal chandelier; huge recording studio; his and hers powder rooms; grand entry hall and staircase; formal dinning room; breakfast room; butler’s pantry and laundry. Atrium courtyard. Seven fireplaces, large sauna with bath; multiple room servants quarters. Basement wine cellar; pool; greenhouse; mature landscape, private 3 car carport, located just north of Sunset off Benedict Canyon.

The new owner is currently working with an architect to renovate the entire building including, landscape and hardscape. First is to remove the asbestos and remove all the interior plaster and wall coverings to expose the framing and keep the building water tight. This process will make it much easier to identify the structural components and make knowledgeable decisions in a more effective manner. After all this building is 87 years old and structural plans and specifications or as built drawings are non existent, however we were able to find some existing architectural drawings that were a big help for the architect.

Scope of Work:

Our company was hired to remove the friable asbestos in the form of TSI from the basements and attics including non friable asbestos containing vinyl tile from the kitchen and pantry.

Some features of the project:

  • Asbestos Removal
  • Project was completed on schedule
  • The opportunity to contract additional demolition

Date of Completion: 11/25/2015

Asbestos Removal

Client: Hollywood Park Land Company, LLC

Construction Management: Turner Construction Company

Turner Construction Superintendent: Ken Simeon

Asbestos Consultant: Citadel Environmental

Attributes: Hollywood Park Horse Racing Site

The Hollywood Park is situated on 300 acres of land with various buildings that were demolished earlier in the year with just a few remaining buildings that were left to demolish the Quarantine Barn, Hotel and Racing Office. Our company was hired to remove the asbestos from each of the last remaining buildings prior to demolition. All hazardous material was removed with our work forces. Citadel Environmental worked closely to make sure the removal was being done correctly and proper statement of clearance was given at the end.

Some features of the project:

  • Asbestos Removal
  • Ability to work 12 hour days and finish ahead of schedule.
  • Working closely with Citadel Consultants to remove in accordance with strict removal methods

Date of Completion: 8/27/2015

ready to help using our surefire paint by numbers demolition asbestos abatement system. Call us for a FREE Consultation!